Home 2D Video Measuring Machines
2D Video Measuring Machines
Specification
- XYZ Measuring stroke (mm):300 x 200 x 200
- Stage surface area (mm):506 x 356
- Loading capacity (kg):30
- XY Measuring accuracy:4 + L/50 μm
- Stage drive:Adopt Rolling Drive Nut and free movement lever.
- Stage glass:Adopt optical glass and precision grinding process.
- Vision system:Japanese made color high-resolution CCD camera.
- Lens:*High-resolution Zoom optics Lens(Detent).
- Magnification:0.7x~4.5x (23x~150x)
- Linear scale:Resson RL471 / 1μm (XYZ)
- Counter:RD-15Q / RS232 output
- Control:Manual
- Software:RVS-250 Image Measuring Quality System
- Power supply:AC115V/230V, 50/60Hz
* Detents:Obtain specific "stops" throughout the zoom range by
selecting a body tube with Detents. Typically used in
systems where each position requires calibration,
detents allow for pre-set stops at 1X, 2X, 3X and 4X
on the zoom scale
selecting a body tube with Detents. Typically used in
systems where each position requires calibration,
detents allow for pre-set stops at 1X, 2X, 3X and 4X
on the zoom scale

